From 1 - 4 / 4
  • From June 23rd to November 4th 2016 Geotech Ltd. carried out a helicopter-borne geophysical survey over part of East Isa in Queensland (figure 1). Operations were based at Cloncurry, Queensland. The traverse lines were flown in an east to west (N 90° E azimuth) direction with 2km and 2.5km traverse line spacings, with three Tie lines flown perpendicular to the traverse lines. During the survey the helicopter was maintained at a mean altitude of 76 metres above the ground with an average survey speed of 90 km/hour. This allowed for an actual average EM Transmitter-receiver loop terrain clearance of 38 metres and a magnetic sensor clearance of 68 metres. The principal geophysical sensors included a versatile time domain electromagnetic (VTEMTMPlus) full receiver-waveform system, and a caesium magnetometer. Ancillary equipment included a GPS navigation system, laser and radar altimeters, and inclinometer. A total of 15697 line-kilometres of geophysical data were acquired during the survey. The electromagnetic system is a Geotech Time Domain EM (VTEMplus) with full receiver-waveform streamed data recording at 192 kHz. The "full waveform VTEM system" uses the streamed half-cycle recording of transmitter current and receiver voltage waveforms to obtain a complete system response calibration throughout the entire survey flight. The VTEM transmitter loop and Z-component receiver coils are in a concentric-coplanar configuration and their axes are nominally vertical. An X-component receiver coil is also installed in the centre of the transmitter loop, with its axis nominally horizontal and in the flight line direction. The receiver coils measure the dB/dt response, and a B-Field response is calculated during the data processing. In-field data quality assurance and preliminary processing were carried out on a daily basis during the acquisition phase. Preliminary and final data processing, including generation of final digital data products were undertaken from the office of Geotech Ltd. in Aurora, Ontario. A set of Conductivity Depth Images (CDI) were generated using EM Flow version 3.3, developed by Encom Technologies Pty Ltd. A total of forty-five (45) dB/dt Z component channels, starting from channel 4 (21 µsec) to channel 48 (10667 µsec), were used for the CDI calculation. An averaged waveform at the receiver was used for the calculation since it was consistent for the majority of the flights with minor deviation from the average. Digital data includes all electromagnetic and magnetic data, conductivity imaging products, mulitplots plus ancillary data including the waveform.

  • Broadband and audio magnetotelluric (BBMT and AMT) data at 476 sites on a 2 Km grid were acquired in the Cloncurry region between July and November 2016. The survey covered an area of appriximatly 40 km x 60 km on the eastern margin of the Mount Isa Province. The Cloncurry magnetotelluric (MT) project was funded by the Geological Survey of Queensland and is a collaborative project between the Geological Survey of Queensland and Geoscience Australia. Geoscience Australia managed the project and peformed data QA/QC, data analysis, and produced two-dimensional (2D) and three dimensional (3D) inverse models for both the BBMT and AMT data. This report details the field acquisition program and the methodologies used for processing, analysing, modelling and inverting the data.

  • The Exploring for the Future program Virtual Roadshow was held on 7 July and 14-17 July 2020. The Minerals session of the roadshow was held on 14 July 2020 and consisted of the following presentations: Introduction - Richard Blewett Preamble - Karol Kzarnota Surface & Basins or Cover - Marie-Aude Bonnardot Crust - Kathryn Waltenberg Mantle - Marcus Haynes Zinc on the edge: New insights into sediment-hosted base metals mineral system - David Huston Scale reduction targeting for Iron-Oxide-Copper-Gold in Tennant Creek and Mt Isa - Anthony Schofield and Andrew Clark Economic Fairways and Wrap-up - Karol Czarnota

  • The Exploring for the Future Program facilitated the acquisition of major geoscience datasets in northern Australia, where rocks are mostly under cover and the basin evolution, mineral, energy and groundwater resource potential are, in places, poorly constrained. In an effort to support sustainable, regional economic development and build stronger communities in these frontier areas, integration of new and legacy data within a consistent platform could enhance the recognition of cross-disciplinary synergies in sub-surface resource investigations. Here we present a case study in the South-Nicholson Basin, located in a poorly exposed area between the prospective Mt Isa Province and the McArthur Basin. Both regions host major base metal deposits, contain units prospective for energy resources, and hold significant groundwater resources in the overlying Georgina Basin. In this study, we interpret a subset of new regional-scale data, which include ~1 900 km of deep seismic reflection data and 60 000 line kilometres of AusAEM1 airborne electromagnetic survey, supplemented with legacy information. This interpretation refines a semi-continental geological framework, as input to national coverage databases and informs decision-making for exploration and groundwater resource management. This study provides a 3D chronostratigraphic cover model down to the Paleoproterozoic basement. We mapped the depth to the base of intervals corresponding to geological eras, as well as deeper pre-Neoproterozoic superbasin boundaries to refine the cover model. The depth estimates, based on the compilation, interpretation and integration of geological and geophysical datasets, inform the basement architecture controls on evolution of the basin, with several key outcomes: 1) expanded mapped size of the South Nicholson Basin, potentially, increasing prospectivity for hydrocarbons and basin-hosted mineralisation, 2) improved stratigraphic unit correlations across the region, 3) identification of major crustal structures, some of which are associated with mineralisation and springs, and 4) improved basin architecture definition, supporting future investigation of groundwater resources.